Shandong WeizeMechanical Equipment Co.,Ltd
5 1

The Barrel Filling Machine---WZ

Contact Now* Send an Inquiry to this supplier.
or
Start Order * Name your price
You may also be intersted in
beer brew tankscraft beer brew

Contact us

Shandong WeizeMechanical Equipment Co.,Ltd
[China]

Address
Xiangtai Square ,Hero Mountain Rd . Jinan Shandong
Phone
86-531-82971479
Contact name
Monica Zou

Quick Information

  • Brand Name: WEIZE
  • Place of Origin: China
  • Model Number : 01
  • Processing Types : Alcohol
  • Condition : New
  • Specification : Customized
  • Volume / Capacity : 50L ~ 10000 /2bbl ~100bbl
  • Application Area : Brewery / Restaurant / Pu
  • Automatic Control : Digital Display & Control

Description

The Fermentation System for Beer Brewing Equipment 
The wort after proper mashing procedure will flow into fermentation tank . After the beer yeast take chemical and biological reaction with sugar molecule in wort , the alcohol beer is ready to drink .
Depends on different beer model and brewing method ,the whole fermentation usually lasts 8-20 days .There are also some brewery in Europe countries prefer to keep longer period storage into fermentation tank for special flavor .
Sometimes the bright beer tanks will be arranged after fermentation period ,keep beer for longer storage ,curing . The bright beer tanks are similar like fermentation tanks ,also double layer vessel with bottom conical shape ,matching with continuous cooling device . Sometimes the bright beer tanks can made into single layer putting into the cold storage room for continuous cool temperature .
 

Tanks Material (Standard Specification) Material (Updating Specification) Thickness/Size (According
to different capacity)
Specification
Inner liner Stainless Steel 304 Stainless Steel 316 2.5/3/4/5/6/8 mm Polishing Plate
Outer Layer Stainless Steel 304 /
Red Copper
Stainless Steel 316 /
Red Copper
1.5/2/2.5/3/4 mm Polishing/Brushed/Mirror/
Red Copper Plate
Valves &Pipes Stainless Steel 304 Stainless Steel 316 DN25/DN32/DN50 ETC Good Chinese Brand /
Updating Europe Brand

Specification

There are various volume fermentation tanks optional ,like the small capacity tank 100L ,150L ,200L ,500L ,7HL ,1000L ,10BBL ,15BBL ,2000L ,and the middle sized 5Tons ,10Tons ,20Tons ,50Tons etc . For different tank capacity ,the detailed specification are different .
According to the requirement of exact beer brewing procedure ,the volume of mash tanks and fermentation tanks rate are usually 1:1 or 1:2 .


Double Layer Tank

Inner tank Layer:Stainless steel 304 , argon arc welding , fine polishing for both sides
Outer tank layer:Stainless steel 304 polishing plate /brushed plate /red copper plate , argon arc welding , fine polishing for both sides .

Heating Method:The mashing system match with heating device for the wort mashing process under different temper stage . Different heating method are optional ,including the electricity heating , gas steam generator heating ,oil steam generator heating etc .

Cooling Method :The refrigeration unit working efficiently to keep continuous glycol liquid recycle among the glycol tanks , the fermentation tank cololing belts , the heat plate exchanger and the pipelines . The different temperature cooling stage requirement during beer brewing process can be accomplished by the useful heat changing recycle of glycol liquid , tap water and hot wort .

Insulation Layer :There are polyurethane foam inserting between two layers, 80-120mm thick .



Main Parts

Manhole

stainless steel manhole fixed at the top /mid-side of fermentation tanks ,help a lot to observe the tank inside condition . Weld on the tank and do fine polishing treatment .

Butterfly Valve

Good quality stainless steel butterfly valve ,drain valve and simple valve ,help a lot to control the wort flow .

Testing Gauge

Professional saccharimeter helps adjust the wort density properly . The pressure gauge shows exact tank inside pressure .

Clean Ball

Each fermentation insider top are fixed with stainless steel wash ball for automatic rotation and water spray to clean the tank inside throughly .

Bimetallic thermometer

Platinum probe deep into the tank, effectively monitor the actual temperature inside the tank.

Safety valve

Equipped with breathing valve, water seal valve, ice water solenoid valve and other body, to achieve automatic decompression and decompression function, effectively avoid the pressure caused by excessive pressure in the tank.


Photo Gallery

FAQ
  • The Beer Equipment Warranty Period

    -- The main tank body guarantee period 3 years ,no leaking point allowed.
    -- Electric parts like the motors ,pumps , power cabinet warranty period 6-12 months according to different brand and level .
    -- Lifetime service for equipment maintenance ,repair ,damage parts exchange direction .

  • Quality Supervise

    -- Each beer equipment will do serious quality testing before delivery .For example the main tank bodies will keep 3 to 7 days continuous test under 0.4Mpa pressure .
    -- Accept the client to check processing and quality before delivery .
    -- Accept the third party testing in site or in laboratory.

  • Service before and after sales

    -- Supply customized design and produce to meet the clients’ exact needs
    -- Professional engineer to help install and maintain the beer equipment.
    -- Professional brewer engineers help training the standard beer brewing procedure and different beer recipe .
    -- Supply all the raw materials needed in beer brewing procedure .
    -- Offer direction on beer brewing & sales strategy .
    -- Lifetime service and direction

  • Delivery

    -- The beer equipment delivery date is confirmed when sign the sales contract according to actual condition .Usually the full set beer equipment smaller than 1000L need 25-40 days to produce ; the full set brewing equipment 1000L - 5000L need 45- 60 days to deliver ; the beer equipment capacity bigger than 5000L need 2-5 months to manufacture .Once require independent spare parts ,the renew delivery period need to reconfirm .
    -- The beer equipment packing method will be confirmed according to the transport way and the exact clients requirement . Usually it is packed with PE foam ,and fasten with steel wire in marine container . The plywood carton and frame packing are also available .


Beer Brewing Flowchart

 



 


Price

  • Delivery Port : Qingdao

Packaging & Delivery

  • Packing :Bubble Film / PE Film / Plywood Case / Steel Frame
  • Delivery Lead Time : 35 - 60 working days
  • Supply Ability : 100 sets per month

Product Image

  • The Barrel Filling Machine---WZ image

Related products from premium suppliers on EC21

Send an Inquiry to this supplier

Send an Inquiry to this supplier
* From
  To Monica Zou
Shandong WeizeMechanical Equipment Co.,Ltd
* Buying Product
- Please enter your specific buying item.
e.g. 42 inch LCD TV, leather executive chair
Category : Beverage Processing Machinery
* Message

Use English only Max. 2000 characters. (Min. 20)

Send
EC21.com does not guarantee the validity of product information or the credentials of sellers.